Road Closure on Tues, July 17th from 7:00 am -10:30 am

On Tuesday Poe Asphalt will begin sealing Standard Street 

  • The northern school driveway entrance will be closed from 7:00 – 9:00 a.m. Vehicle school entrance/exit access will be by the southern driveway entrance. Normal directional traffic travel will be in operation to the public except vehicles exiting school parking lot in this time frame will not be permitted to drive north bound on Standard street and a ROAD CLOSED sign will reflect this.
  • Between 9:00 – 10:30 a.m. The first entrance will be open and the second entrance will become closed. From 9:00 – 10:00 vehicle school access will be by south bound travel on Standard street. Please have staff and parents enter Standard street from Indiana street at this time. I anticipate Standard south end to be completely open by 10:30a.m. 
  • During this construction sequence ROAD CLOSED signs will be placed on streets to close that particular lane direction of travel preventing vehicles from driving onto fresh oil. 
  • There will always be one entrance open at all times.  

 

We so appreciate your patience with this street project.